Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-63) - Pelican Creek Crossing Improvement

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-63) - Pelican Creek Crossing Improvement
Author :
Publisher :
Total Pages : 4
Release :
ISBN-10 : OCLC:962178950
ISBN-13 :
Rating : 4/5 ( Downloads)

Book Synopsis Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-63) - Pelican Creek Crossing Improvement by :

Download or read book Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-63) - Pelican Creek Crossing Improvement written by and published by . This book was released on 2001 with total page 4 pages. Available in PDF, EPUB and Kindle. Book excerpt: BPA provides funds to the Grande Ronde Model Watershed Program which cooperates with local agencies and landowners to plan, fund, and implement anadromous fish habitat restoration projects in the Grande Ronde Basin. The GRMWP has agreed to partially fund three bridge replacement projects with the Union County Public Works Department. This Supplement Analysis covers only the bridge replacement activities that will take place at the Pelican Creek crossing. The Union County Public Works Department is responsible for replacing structurally deficient bridges with structures able to pass 50-year peak flow events. The UCPWD replacement structures of choice, due to budget limitations, are large 8-10 foot corrugated metal pipes. These pipes would meet peak flow requirements but would be less than ideal for fish passage. The GRMWP proposes to provide funding assistance to UCPWD to upgrade replacement structures to full-channel spanning stringer bridges. These full-channel spanning structures will provide the best possible conditions for fish passage, water quality, and accommodation of peak flows.


Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-63) - Pelican Creek Crossing Improvement Related Books

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-63) - Pelican Creek Crossing Improvement
Language: en
Pages: 4
Authors:
Categories:
Type: BOOK - Published: 2001 - Publisher:

DOWNLOAD EBOOK

BPA provides funds to the Grande Ronde Model Watershed Program which cooperates with local agencies and landowners to plan, fund, and implement anadromous fish
Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-95) - Libby Creek Channel Stabilization Project
Language: en
Pages: 4
Authors:
Categories:
Type: BOOK - Published: 2002 - Publisher:

DOWNLOAD EBOOK

BPA proposes to fund MFWP to construct a channel stabilization project, which would restore the dimension, pattern, and profile of 3,200 feet of Libby Creek. Th
Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-110) - Pahsimeroi Holistic Restoration - Gydesen/Hayes Riparian Enhancement and Irrigation Improvement Project
Language: en
Pages: 2
Authors:
Categories:
Type: BOOK - Published: 2003 - Publisher:

DOWNLOAD EBOOK

The Bonneville Power Administration is proposing to fund a riparian enhancement and irrigation improvement project with the Custer Soil and Water Conservation D
Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-160) - Protect and Restore the Lapwai Creek Watershed
Language: en
Pages: 4
Authors:
Categories:
Type: BOOK - Published: 2004 - Publisher:

DOWNLOAD EBOOK

The proposed restoration and protection of the Lapwai Creek Watershed will assist in the recovery and restoration of fish and wildlife habitat. All activities w
Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-109) - East Fork Holistic Restoration - Salmon River East Fork (SEF) 12 and Herd Creek (HC) 1
Language: en
Pages: 3
Authors:
Categories:
Type: BOOK - Published: 2003 - Publisher:

DOWNLOAD EBOOK

The Bonneville Power Administration (BPA) is proposing to fund activities that will improve fish passage at Salmon River East Fork diversion 12 and at Herd Cree